BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 16, 2026

Site work and paving for a road / highway in Cheney, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Removing asphalt concrete pavement, concrete barrier and hot mix asphalt (HMA) patches, shoulder finishing, pavement repair excavation including haul, asphalt for fog seal, crack sealing, planing bituminous pavement, HMA for pavement repair, HMA paving, joint adhesive for bituminous paving, ESC lead, silt fence, erosion/water pollution control, tackifier, seeding and mulching, medium compost, high visibility fence, beam guardrail posts and blocks, flexible guide post, pavement markings, sinusoidal rumble strip, permanent signing, project temporary traffic control, portable changeable message sign, construction signs class A, SPCC Plan, traffic control and other work. Involves 46 items and 30 working days. Work class 4, asphalt concrete paving. Estimated value $2,000,000 - $3,000,000 WA DOT - SR 904, I-90 to Cheney Paving *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Roads / Highways

$2,124,000.00

Public - State/Provincial

Paving, Site Work

36

6

2

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
31
Bidding Soon
296
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2026

June 29, 2026

Project location map

WA-904, Cheney, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.