Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 9, 2026 at 8:00 PM
Updated May 16, 2026
Site work and new construction of a pre-engineered storage facility in Millville, Utah. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.
USDA-APHIS-Wildlife Services requires construction of a new kennel building in accordance with the final design documents from the A&E firm Cushing Terrell. The building will be a pre-engineered metal structure of approximately 3,400 square feet, divided into four sections: kennel areas A and B, a mud room, and a mechanical room. The facility supports the mission to generate and disseminate ecological information related to carnivore management, focusing on reducing conflicts with livestock, humans, and native prey species. The Predator Research Facility's mission is to generate and disseminate ecological information related to carnivore management, particularly aimed at reducing conflicts with livestock, humans, and native prey species. The Work consists of the following: 1. The Work constitutes construction of a new kennel facility with a central mud room and mechanical room. 2. The building type is a Pre-Engineered Metal Building with Concrete Masonry enclosure walls and chain link fencing to structure. . Project will be constructed under a single prime contract. 1. The project may be divided into two phases for funding purposes. If phased the scope will be as follows: a. Phase 1 - Work below ground and at grade level, consisting of: o Sitework o Underground Utilities o Concrete Foundations and Floor Slabs b. Phase 2 - Work above ground, consisting of: o Masonry Walls o Steel Structure o Roofing o Mechanical/ Plumbing Submit questions to james.g.roloff@usda.gov no later than April 24, 2026, at 12 p.m. CT. The estimated magnitude of this project is between $1M and $5M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Warehouse / Distribution - Pre-Engineered Storage Building
$5,000,000.00
Public - Federal
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2026
June 9, 2026
4200 S 600 E, Millville, UT
Related To This Project
Millville, UT
Bid Date: Feb 17 2026
Millville, UT
Bid Date: Feb 05 2026
Millville, UT
Bid Date: Aug 25 2020
Millville, UT
Bid Date: Jul 26 2023
Millville, UT
Bid Date: Mar 03 2023
West Point, UT
--
Spanish Fork, UT
Bid Date: Apr 14 2026
Spanish Fork, UT
Bid Date: Apr 21 2026
Salt Lake City, UT
Bid Date: Apr 10 2026
Ephraim, UT
Bid Date: Apr 17 2026
St George, UT
Bid Date: Mar 31 2026
Layton, UT
Bid Date: Apr 21 2026
Orem, UT
Bid Date: Apr 30 2026
Salt Lake City, UT
Bid Date: Apr 16 2026
Logan, UT
Bid Date: Apr 03 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
