Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 8, 2026 at 8:00 PM
Updated May 16, 2026
Site work for a water / sewer project in Shillington, Pennsylvania. Completed plans call for site work for a water / sewer project.
The work includes furnishing all labor, materials, equipment, and appurtenances for the installation of approximately 1,000 linear feet of 8-inch PVC sanitary sewer main. It also involves installing and replacing 8-inch, 12-inch, and 24-inch storm sewer pipes, and connecting existing sanitary sewer laterals to the new sanitary sewer main. Proposals must be accompanied by proposal security equal to ten percent (10%) of the total proposal amount. All proposals will be irrevocable for sixty (60) calendar days from the date of bid opening, except as otherwise provided in the instructions. The project must be substantially completed within sixty (60) calendar days and finally completed within seventy-five (75) calendar days from the notice to proceed. A performance, payment, and maintenance bond equal to 100% of the total contract amount is required. A Nondiscrimination/Sexual Harassment Form is required. The project is subject to the provisions of the Pennsylvania Prevailing Wage Act, and prevailing minimum rates must be paid by contractors. Contract documents are available from the office of the Engineer for a non-refundable deposit of seventy-five dollars, which includes plans and specifications. The Borough of Shillington reserves the right to accept or reject any or all proposals or portions thereof and to delete portions of the project based on budget constraints. Question Deadline 05/01/2026 All questions about the meaning or intent of the Bidding Documents are to be directed to ENGINEER. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by ENGINEER as having received the Bidding Documents.Questions received less than ten (10) days prior to the date for opening of Bids may not be answered.
Post-Bid
Water / Sewer
$800,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
