Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 14, 2026 at 8:00 PM
Updated May 15, 2026
Site work and paving for a mixed-use development in Morton, Washington. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Requires grind and inlay the traveled surfaces of US 12 from 0.07 miles west of Bridge 12/221 to MP 77.48 with hot mix asphalt (HMA) 1/2" PG 58H-22, joints replacement, applying new membrane and new HMA on bridge No. 12/221, partial mill and fill for bridge 12/226 and paving above existing bridge 12/223.25 and bridge 12/224.25, traffic control and other work. The ADA features and APS buttons at the US 12/Jackson Hwy intersection will also be upgraded as part of this project. Involves 67 items and 51 working days. Work class 4, asphalt concrete paving. Estimated value : $6,000,000 - $7,000,000 WA DOT - US 12, I-5 to 0.5 Mile East of Harms Rd Paving *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
Bridges / Tunnels
$7,000,000.00
Public - State/Provincial
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 3, 2026
August 3, 2026
US-12, Morton, WA
Related To This Project
Morton, WA
Bid Date: May 14 2026
Morton, WA
Bid Date: Jun 24 2026
Morton, WA
Bid Date: Apr 21 2026
Morton, WA
--
Morton, WA
Bid Date: Aug 13 2025
Morton, WA
Bid Date: May 27 2025
Morton, WA
Bid Date: May 05 2025
Morton, WA
Bid Date: Apr 28 2025
Morton, WA
Bid Date: Feb 11 2025
Morton, WA
Bid Date: Sep 12 2024
Morton, WA
--
Morton, WA
Bid Date: Jul 10 2024
Morton, WA
Bid Date: Jul 10 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
