BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 11, 2026 at 8:00 PM

Updated June 12, 2026

This is a service / maintenance or supply contract in Sugarloaf, Pennsylvania. Contact the soliciting agency for additional information.

Initiating Organization: Engineering District 4-0 Agreement Type: Project Specific 100% State Funded: No Services Requested: Construction Inspection Selection Process: Modified Part 1 Location Description State Route/Section Luzerne County 80/353 Luzerne County 93/RLN Part Name: 111770/120104 I-80 EB/WB ov SR 93 Sugarloaf Twp Project Description: PART 1 ECMS # 111770 and ECMS 120104 for I-80 EB and WB over SR 93, including SR 93 and I-80 ramp in Sugarloaf Township, Luzerne County. Proposed project is the replacement of bridges carrying I-80 EB and WB over SR 93 with reconstruction of ramps at SR 93 and I-80. Proposed work includes structure replacements, reconstruction and resurfacing, stormwater BMPs, E&S measures, guiderail replacement, and other miscellaneous work. Construction will be completed with various traffic control stages including lane closures and ramp detours. Anticipated Part 1 Staffing Needs: One (1) Transportation Construction Inspection Supervisor (TCIS) and Two (2) Transportation Construction Inspectors (TCI), day and night work. TCI must have bridge construction, roadway reconstruction and BMP/E&S construction inspection experience, PennDOT/ACI Certification and ECMS documentation experience. Estimated Project Construction Duration: March 2027 to May 2029. Anticipated NTP: March 2027 Project Time: Day and Night time Part 2 Location Description State Route/Section Lackawanna County 7401/BRG Part Name: 67170 Goers Hill Bridge 7401-BRG Lackawanna Co Project Description: PART 2 ECMS 67170 Goers Hill Bridge Replacement SR 7401-BRG Archbald Borough, Lackawanna County. Proposed project is structure replacement of existing concrete filled I-beam bridge with prestressed concrete spread box beam bridge. Work includes roadway resurfacing, drainage, guiderail and standard construction items. Traffic control will involve temporary roadway. Anticipated Part 2 Staffing Needs: One (1) Transportation Construction Inspector (TCI). TCI must have bridge construction inspection experience, NECEPT certification, PennDOT/ACI Certifications and ECMS documentation experience. Estimated Project Construction Duration: September 2026 to August 2027. Anticipated NTP: September 2026 Project Time: Day and Night time Part 3 Location Description State Route/Section Luzerne County 1030/P62 Part Name: 115734 SR 1030 ov Harveys Creek Lake Township Project Description: PART 3 ECMS #115734 SR 1030 ov Harveys Creek in Lake Township, Luzerne County. Proposed project is structure replacement of existing stone masonry deck arch and concrete slab combination structure with a single-cell precast box culvert with precast end sections with debris removal. Work includes roadway realignment and reconstruction for sight distance improvement, roadway widening, general roadway items and miscellaneous work. Traffic control will involve a detour. Anticipated Part 3 Staffing Needs: One (1) Transportation Construction Inspector (TCI). TCI must have bridge construction inspection experience, NECEPT certification, PennDOT/ACI Certifications and ECMS documentation experience. Estimated Project Construction Duration: March 2027 to December 2027. Anticipated NTP: March 2027 Project Time: Day and Night time Part 4 Location Description State Route/Section Lackawanna County 4036/250 Part Name: 67224 SR 4036 ov Falls Creek, Newton Township Project Description: PART 4 ECMS #67224 SR 4036 ov Falls Creek in Newton Township, Lackawanna County. Proposed project is structure replacement on SR 4036 to replace temporary emergency pipes installed due to 2023 flood event. Proposed structure is a single span composite pre-stressed spread box beam bridge on integral abutments. Work includes roadway and guiderail updates with miscellaneous work. Traffic control will involve a detour. Anticipated Part 4 Staffing Needs: One (1) Transportation Construction Inspector (TCI). TCI must have bridge construction inspection experience, NECEPT certification, PennDOT/ACI Certifications and ECMS documentation experience. Estimated Project Construction Duration: March 2027 to October 2027. Anticipated NTP: March 2027 Project Time: Day and Night time The method of contractor selection has not been determined at this time. PA DOT - RFQ - Inspection for 80/353 & 93/RLN, 4036/250, 1030/P62, 7401/BRG

Conceptual

Bridges / Tunnels

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
496
Active Projects
255
Bidding Soon
3,248
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

Project location map

Multiple Locations, Sugarloaf, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.