BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 15, 2026 at 8:00 PM

Updated August 19, 2026

Site work and new construction of a municipal facility in Margate City, New Jersey. Completed plans call for the construction of a 12,678-square-foot, two-story above grade municipal facility; and for site work for a municipal facility.

In general, this project consists of the construction of a New Public Works Building to be located on Block 324.01 , Lot 125 in Margate City, Atlantic County, New Jersey. The proposed facility includes a building with a ground floor of 6,731 square feet and a second floor of 5,947 square feet associated site improvements and improvements in the Monmouth Avenue rightof-way. The existing public works facility on the site will remain in operation during construction located on Lot 2.01 . This project includes all architectural, structural, civil/site, mechanical, electrical, plumbing, and fire protection systems complete in order to provide a turnkey facility for immediate use and occupation by the Margate City Public Works Department. The allowable on-site area for use by the contractor during construction is shown on the Demo Plan Sheet 7 of 16. The contractor will be required to provide access throughout the project to the on-site fueling facility to City vehicles. The above scope of work outlines the general items and distribution of work and shall not be construed as being all inclusive. The plans entitled "Margate Public Works Building--in the City of Margate City, Atlantic County, New Jersey, are appended hereto and are made part of these specifications. Bidders are required to submit all questions in writing to the attention of Joseph Johnston of Remington & Vernick Engineers at EHToffice@rve.com, no later than 5:00 p.m. on Wednesday July 29, 2026. Disclaimer: IN ORDER FOR YOUR BID TO BE CONSIDERED A LEGAL BONAFIDE BIDDER ON THE PROJECT, DOCUMENTS MUST BE PURCHASED FROM REMINGTON, VERNICK ENGINEERS DIRECTLY. Construction of a new public works facility including all associated building systems and infrastructure required for a municipal works complex. Bonds: 10% Bid Bond, Certified Check required, Performance Bond required (unspecified amount). *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

GC Bidding

$7,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
463
Active Projects
217
Bidding Soon
2,744
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2026

October 26, 2026

Project location map

Multiple Locations, Margate City, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.