BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 31, 2026 at 8:00 PM

Updated August 6, 2026

Site work and renovation of a sidewalk / parking lot in Pompton Lakes, New Jersey. Completed plans call for the renovation of a sidewalk / parking lot; and for site work for a sidewalk / parking lot.

Replacement of 14 ADA curb ramps including reconstruction of catch basins, removal and replacement of concrete curbs, concrete sidewalks, and driveway aprons, installation of detectable warning surfaces, top soil, seed, and traffic striping. Anyone wishing to review the plans or has questions may also contact the Borough Engineer at the office of Darmofalski Engineering Associates, by calling 973-835-8300 or emailing tab@darmofalski.com. Bonds: $20,000 Bid Bond, Certified Check required, 100% Performance Bond, 100% Payment Bond. Cost estimate range at $100,000.00 - $150,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The project scope of work includes the replacement of 14 ADA curb ramps at various intersections in the Borough of Pompton Lakes in the Base Bid. All ADA curbs will be replaced at the following intersections with: Magnolia Avenue & Woodlawn Avenue, Riverdale Boulevard & Laurel Avenue, Riverdale Road & Pine Street, Riverdale Road & Edwards Avenue, and Willow Avenue & Woodlawn Avenue. The scope of work includes, but is not limited to: reconstruction of four (4) Type B catch basins; removal and replacement of 750 linear feet of 9x18 Portland cement concrete curbs; removal of 250 SY of existing concrete sidewalks and driveway aprons; installation of 250 SY of 4" thick, NJDOT Class B concrete sidewalks; installation of 115 SY of 6" thick, NJDOT Class B, reinforced, concrete ADA landings and aprons; installation of eighteen (18) cast-iron 2'x4' detectable warning surfaces; and, placement of 500 SY of top soil (4" thick), seed, and salt hay. Other work required includes sign replacement and removal and replacement of traffic striping and markings. An ADD ALTERNATE includes the replacement of an additional three (3) ADA curb ramps.

GC Bidding

$150,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,182
Active Projects
511
Bidding Soon
8,127
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2026

September 18, 2026

Project location map

Multiple Locations, Pompton Lakes, NJ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.