Site work and paving for a mixed-use development in Mishawaka, Indiana. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of February 21, 2025, project was awarded to HRP Construction but awarded amount is not available. Project Description: The project consists of new storm sewer installation (up to 72-inches), new stormwater outfall to St. Joseph River, new small and large sanitary sewer installation (up to 60-inches), sanitary sewer lateral replacement, new watermain installation, water service replacement, pavement reconstruction, new concrete curb and gutter, sidewalk, and streetscape improvements along with incidental construction on adjacent streets, and other pertinent work as described in the project documents. The General Contractor shall be prequalified by INDOT to perform a minimum of one (1) work type applicable to this project. A certified check payable to the City of Mishawaka, Indiana or a satisfactory Bid Bond executed by the bidder and surety company, in an amount equal to five percent (5%) of the bid shall be submitted with each bid. The bidder awarded the contract will be required to furnish a separate Performance Bond and Payment Bond, each in the amount of one-hundred twenty-five percent (125%) of the contract price before commencing work. The Performance Bond and Payment Bond shall remain in effect throughout the entire construction period and in addition a Maintenance Bond in an amount of 10% for a period of three years from the date of final completion will be required. Each bidder shall be required to complete all documents listed in the Checklist for Bidders. Each bidder shall be required to complete the Bid Form included with these documents. The earliest start date for work on Third Street, from Race Street to Cedar Street, to begin shall be May 5, 2025. The Normain Park construction intermediate completion date is May 23, 2025. The Lincolnway construction at Laurel Street intermediate completion date is November 26, 2025. The substantial completion date for this project shall be October 30, 2026, and the Final Completion Date shall be November 27, 2026. The Board of Public Works and Safety of the City of Mishawaka, Indiana, reserves the right to reject any and all bids and to waive any irregularities in bidding and to make an award in the best interest of the City. No bid or bid security may be withdrawn after the scheduled closing time for receipt of bids for at least sixty (60) days.

Award

Water / Sewer

$5,984,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
259
Active Projects
162
Bidding Soon
1,453
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2025

May 5, 2025

Project location map

Multiple Locations, Mishawaka, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.