BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 8, 2025 at 8:00 PM

Updated May 10, 2025

Demolition, site work and addition to an educational facility in Cheney, Washington. Conceptual plans call for the addition of a 1,500-square-foot educational facility; for the demolition of a educational facility; and for site work for a educational facility.

Request for Qualifications Cheney Public Schools #360 Professional Architectural Design Services Cheney Public Schools #360 is requesting statement of qualifications from professional architectural firms in accordance with RCW 39.80.030. In seeking professional architectural design services, Cheney Public Schools requests qualifications from firms with recent experience in commercial kitchen expansion construction in Washington State. Cheney Public Schools is planning to expand existing kitchens at Windsor Elementary School and Salnave Elementary School. The scope of work includes the expansion of approximately 750 sq. ft. at each school to accommodate the needs for additional prep space and equipment where meals are made daily from scratch for students. The project is expected to be delivered via design-bid-build, with a bid opening in December 2025. Construction is anticipated to begin in the spring of 2026 Questions are due via email to Lisa Lundy by 05/13/25 at 12:00 p.m. Project Manager at Turner & Townsend Heery lisa.lundy@turntown.com. Cheney Public Schools encourages participation by minority and women-owned firms and veteran-owned firms.

Conceptual

Educational

$1,100,000.00

Public - County

Addition, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
27
Bidding Soon
317
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2026

Project location map

Multiple Locations, Cheney, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.