Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 19, 2025 at 8:00 PM
Updated May 20, 2025
Renovation of a municipal facility in Glastonbury, Connecticut. Design plans call for the renovation of a municipal facility.
This project involves interior renovations of the Town-owned building at 50 Nye Road for the benefit of the School District. It is anticipated that the School District's Board Offices would move into the building prior to its current lease at 628 Hebron Avenue expiring on July 30, 2026. Additionally, some School District staff and programs currently based at Smith Middle School would be relocated to 50 Nye Road. However, 50 Nye Road would not house any students. The move would result in 10 rooms at Smith Middle School being freed up for classroom use. The 10 classrooms would eventually house a new team for seventh and eighth grade. Work on the first floor would include expanding smaller offices into larger spaces, renovating the kitchen area, and creating a large conference room with seating for 48 people across four tables. Work on the lower floor would include expanding smaller offices into larger spaces and creating functional storage space. A significant portion of the basement was gutted by the prior owner but never refinished. Remaining walls and ceilings in that area would be removed to allow for the creation of large storage and science kit preparation areas, which will receive new walls, flooring, ceilings, and light fixtures. Mechanical systems will be modified as necessary to accommodate the new layout. Also included in the proposed appropriation is funding for the following: 1) Security system; 2) Landline telephones; 3) Cameras; 4) Exterior and interior signage; 5) Window treatments for offices; 6) Furniture, fixtures and equipment such as marker boards, tack boards, furniture for additional staff relocated to Nye Road that are currently utilizing workstations; 7) Occupancy sensors for energy conservation; 8) Emergency generator; 9) Moving and relocation services; and 10) Establishment of a "slop sink" in the lower level. Of the $1,063,000 proposed appropriation, $990,000 would be for hard construction costs, and $73,000 would be allocated to architectural and engineering costs. As of May 19, 2025, this project is included in the Town of Glastonbury's Fiscal Year 2026-2030 CIP. It is currently in design. Construction is expected to begin in the Fall of 2025. Funding is allotted for FY 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Municipal
$1,063,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2025
50 Nye Rd, Glastonbury, CT
Related To This Project
Glastonbury, CT
--
Glastonbury, CT
--
Glastonbury, CT
--
Glastonbury, CT
--
Glastonbury, CT
--
Glastonbury, CT
Bid Date: Jul 30 2025
Glastonbury, CT
Bid Date: Jul 25 2025
Glastonbury, CT
Bid Date: Sep 17 2025
Glastonbury, CT
Bid Date: May 08 2025
Glastonbury, CT
Bid Date: Dec 04 2025
Glastonbury, CT
Bid Date: Mar 11 2025
Glastonbury, CT
Bid Date: Mar 11 2025
Glastonbury, CT
Bid Date: Mar 11 2025
Glastonbury, CT
Bid Date: Mar 11 2025
Glastonbury, CT
Bid Date: Feb 25 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
