Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 20, 2025 at 8:00 PM
Updated May 21, 2025
This is a service / maintenance or supply contract in Berkeley, California. Contact the soliciting agency for additional information.
The Berkeley Campus of the University of California ("University") is seeking an architect or landscape architect-led team ("Consultant") to perform conceptual design, schematic design, design development, construction documents, bid, construction administration, and other support services as required by the Executive Design Professional Agreement (EDPA) for a new accessible bridge crossing Strawberry Creek at Faculty Glade on the UC Berkeley campus ("Project"). The Project is the highest priority project of the University's Accessible Paths and Places Plan. As part of the first phase of work, the University will ask the selected Consultant team to validate and define the project scope, cost estimate, schedule, and develop a refined Conceptual Design. Faculty Glade is a historic open space within the Campus Park that functions as a community space for gathering, recreation, and relaxation. The glade is an integral element within the campus's evolving landscape heritage. The border of Strawberry Creek may include archeological sites, and the natural landscape setting of the glade is linked to the Faculty Club designed by Bernard Maybeck in 1902. The new bridge would span from South Drive, near the Campanile, to the northwest side of Morrison Hall. The project scope includes the bridge structure as well as necessary landscape restoration and pathway connections at both ends of the bridge and in the affected area underneath the span, including creek restoration or mitigation as applicable. An existing concrete bridge, which does not meet ADA guidelines, would be removed. In conjunction with pathway improvements to be completed by the Clean Energy Campus Project at North Field, the Project would address a significant accessibility gap by creating an accessible north-south pathway from the new Bancroft Parking Garage to the center of the Campus Park. The design intent is to create a minimally intrusive crossing that aligns with ADA requirements, minimizes effects on the creek zone and surrounding landscape, aesthetically fits the campus context, and aligns with the campus's constrained capital resources to implement the project. The Project will be required to meet the University of California Sustainable Practices Policy as well as other relevant UC and University policies and guidelines. Submittals shall not exceed twenty-five (25) single-sided 8.5" x 11" pages, including all the components listed as required elements in this section of the RFQ. Submittals shall provide sufficient information to allow the University to evaluate the Consultant's approach, experience, staff, and availability. Cover, a cover letter, separating tabs, and the hourly rate sheet shall not count toward the page limit. Body text in submittals must not be smaller than the equivalent of Arial, size 11, with 1.25 line spacing, with the exception of Attachment B, which may use smaller text but must still be legible. Pages larger than 8.5" x 11" are not allowed.
Conceptual
Bridges / Tunnels
Public - State/Provincial
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 15, 2026
South Dr, Berkeley, CA
Related To This Project
Berkeley, CA
--
Berkeley, CA
Bid Date: Jun 13 2025
Berkeley, CA
Bid Date: Jun 12 2025
Berkeley, CA
Bid Date: Jun 17 2025
Berkeley, CA
Bid Date: Jun 11 2025
Berkeley, CA
Bid Date: Jun 03 2025
Berkeley, CA
Bid Date: Jun 13 2025
Berkeley, CA
Bid Date: Jun 03 2025
Berkeley, CA
Bid Date: May 29 2025
Berkeley, CA
Bid Date: May 08 2025
Berkeley, CA
Bid Date: Dec 11 2025
Berkeley, CA
Bid Date: Apr 29 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
