BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 29, 2025 at 8:00 PM

Updated October 17, 2025

Demolition, site work and new construction of a water / sewer project in Thomasville, Georgia. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

**As of August 20th, 2025 , this project has not yet been awarded. The project is expected to be awarded on October 2025.** The CMAR Contract will include the following services and Work: 1. Construction of two (2) aeration basins (carrousel oxidation ditch with total volume of 5.6 MG). 2. Construction of one (1) 120-foot diameter secondary clarifier. 3. Conversion of two (2) anaerobic digesters to aerobic digesters. 4. Construction of a clarifier flow splitter box. 5. Construction of a RAS/WAS pump station. 6. Head works improvements. 7. Abandonment of existing clarifiers. 8. Electrical work (including new electrical building and generator). 9. Modifications to existing/potential new sludge dewatering building and belt press. 10. Demolition of existing structures. 11. Construction of bulk storage and feed systems. 12. Modifications to existing process piping. 13. Modifications to existing pump stations. 14. Site grading, drainage and miscellaneous site work. 15. Construction of new administrative and operations building. Owner anticipates that the CMAR's Contract Price will be approximately $60,000.00. The pre-construction services of the CMAR Contract have an expected start date of September 2025 and duration of 100 days. The Notice to Proceed for construction is expected to occur July 2026 with a duration of 730 days. Final completion of the project is expected to be October 2028. Step One: Owner will receive SOQs and evaluate these, along with other information, to develop a list of qualified, responsive Proposers. Step Two: The qualified, responsive Proposers will receive a Request for Proposals and will submit a detailed Proposal for the CMAR Contract for the Owner consideration. QA date - 8 August 2025 Submit questions about the meaning or intent of the Proposal Documents, Addenda, and the related supplemental data to QuestCDN.com. All inquiries must be received no later than 7 days prior to the date for submittal of SOQs.

Post-Bid

Water / Sewer

$60,000,000.00

Public - City

Demolition, New Construction, Site Work

3

3

9

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
48
Bidding Soon
595
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2025

October 14, 2025

Project location map

2299 County Line Road, Thomasville, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.