Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 19, 2025 at 7:00 PM
Updated January 6, 2026
Renovation of a mixed-use development in South Holland, Illinois. Completed plans call for the renovation of a educational facility.
MacArthur Renovations - REBID BP3 - Carpentry. This project titled "MacArthur School Renovation for Echo Joint Agreement" consist of the following major elements: Select abatement of asbestos containing materials; Select demolition of existing construction; Select interior remodeling and renovation; Remodeling of existing restrooms; Roofing replacement; Window replacement; New HVAC equipment, power, controls; New electrical and low voltage utilities and device; Modifications to existing construction to accommodate new work; All other work indicated on the drawings and in the project manual for this project. Proposals must be submitted on the forms provided. All proposals or bids offered must be accompanied by a bid bond in a form acceptable to the school board, cashiers check, or certified check made payable to ECHO Joint Agreement in the amount of not less than five percent (5%) of the total amount of the proposal as a guarantee that if the proposal is accepted, a contract shall be entered into and the performance of the contract is properly secured. No bid shall be withdrawn after the opening of the proposals without the consent of the Board of Directors of ECHO Joint Agreement for a period of sixty (60) days after the scheduled time of closing bids. No bid shall be withdrawn after the opening of the proposals without the consent of the Owner for a period of sixty (60) days after the scheduled time of closing bids. All employees of the Contractor or Subcontractor(s) on construction work for this Project shall be paid wages at rates not less than those prevailing on similar construction in the locality as determined by the Department of Labor in accordance with the applicable provisions of the "Wages of Employees on Public Works Act" (Prevailing Wage Act, Illinois Rev. Stat., 820 ILCS 130/1 et. seq.) and with all applicable provisions of the "Illinois' Preference Act", 30 ILCS 570/.01 et. seq. The successful Bidder of the construction of the improvement will be required to file a performance and payment bond equal to one hundred percent (100%) of the contract, with sureties to be approved by the Architect, which performance bonds shall be conditioned upon proper and faithful performance by the Contractor of the work specified in accordance with the plans and specifications therefore, according to the time and terms and conditions of the contract: and also that the successful Bidder, now the Contractor, shall properly pay all debts incurred by the Contractor in the execution of the work, including those for labor and material furnished for himself and all of his subcontractors. The bonding company shall have a minimum rating of "A VIII " in accordance with Best's Key Rating Guide - Latest Edition. The Contractor shall be required to furnish sufficient insurance or guaranty of indemnity to ECHO Joint Agreement against any and all claims which might arise for damages to persons or property due to the negligence of the Contractor or Subcontractors, or their officers, agents, employees or servants, during the construction of said improvement and until the said improvement has been finally accepted as complete by the Owner. The Owner reserves the right to reject any and all proposals or bids.
Award
Educational
$496,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 5, 2025
January 5, 2026
640 E 168th Pl, South Holland, IL
Related To This Project
South Holland, IL
Bid Date: Dec 23 2025
South Holland, IL
Bid Date: Feb 05 2026
South Holland, IL
Bid Date: Feb 27 2026
South Holland, IL
Bid Date: Mar 04 2026
South Holland, IL
Bid Date: Dec 03 2025
South Holland, IL
--
South Holland, IL
Bid Date: Dec 05 2025
South Holland, IL
Bid Date: Oct 22 2025
South Holland, IL
Bid Date: Sep 08 2025
South Holland, IL
--
South Holland, IL
Bid Date: May 28 2025
South Holland, IL
Bid Date: May 22 2025
Bridge Replacements South 170th Street Over Thorn Creek and 143rd Street Over Tinley Creek - 5781623
South Holland, IL
Bid Date: May 28 2025
South Holland, IL
Bid Date: May 20 2021
South Holland, IL
Bid Date: Mar 25 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
