BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 15, 2026 at 8:00 PM

Updated June 12, 2026

Site work for a water / sewer project in Marion, Iowa. Completed plans call for site work for a water / sewer project.

The general nature of the work is: 985 SY of PCC Full Depth Patch, 113 LF of 6” Sanitary Sewer C900, 467 LF of 8” Sanitary Sewer PVC Truss, 10 LF of 10” Sanitary Sewer PVC Truss, 19 LF of 12” Sanitary Sewer PVC Truss, 10 LF of 15” Sanitary Sewer PVC Truss, 33 LF of 4” Sanitary Sewer Services, 12 Sanitary Sewer Manholes, 23 SY of 4” PCC Sidewalk, 6 SY of 6” PCC Sidewalk Ramp, and miscellaneous related work and appurtenances in accordance with the contract documents. All bids shall be submitted on the Proposal Form furnished, in a sealed and plainly marked envelope indicating it is a bid in response to this notice. Each bidder shall accompany its bid with bid security as defined in Code of Iowa Section 26.8 and as specified in the Instructions to Bidders, placed in a separate envelope attached to the bid. Every bidder shall submit a properly completed and signed statement regarding the bidder’s resident status on the designated form. Each Bidder shall complete and sign the Equal Employment Opportunity / Non-Discrimination Policy Statement and submit it with the bid proposal. The City of Marion reserves the right to defer acceptance of any bid for up to thirty (30) days after receipt of bids, and no bid may be withdrawn during this period. Each successful bidder must furnish a corporate surety bond equal to one hundred percent (100%) of the contract price. A maintenance bond (2-year for sewer or 4-year for paving) or a cash payment of 1.5 percent of the final contract amount will be required prior to final acceptance. Items are exempt from State of Iowa Sales Tax, and tax should not be included in bid prices. The City reserves the right to reject any or all bids and to waive informalities. For project questions contact: Taylor Chittick, EI Project Engineer319.743.6340 jhahn@cityofmarion.org

Award

Water / Sewer

$374,480.00

Public - City

Site Work

26

8

7

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
68
Bidding Soon
1,179
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2026

April 9, 2026

Project location map

Multiple Locations, Marion, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.